A practical RFP structure for a conference venue: background, capacity, flows, technical equipment, accessibility, total cost, shortlist and on-site inspection.
An RFP (Request for Proposal), or a request for proposals to select a venue, is needed when a short email with the date and number of guests is no longer enough. Conference venue requirements help compare the same scope of services. Without them, venues send beautiful presentations, quote different sets of work and interpret the programme in their own way. One price includes furniture and internet, while another lists them as options. One venue shows the capacity of an empty hall, another immediately accounts for the stage, aisles and catering. Comparison quickly turns into untangling assumptions.
At Aventura, we use the RFP as a single description of the task. All participants receive the same background information and respond in one table. Critical conditions require verifiable confirmation. This approach helps assess a venue's suitability before the contract and the total cost before the final choice.
If the conference is already in the plan, submit a request. We will help gather the initial data, prepare the request for venues and link the choice of space with the programme, production and budget.
What input data should be collected before sending an RFP?
Before sending out the RFP, compile a single conference brief: purpose, audience composition, expected attendance, dates, working schedule, and key program functions. Add setup and teardown hours, requirements for recording, broadcasting, and translation. Then venues will calculate the same event based on identical input data, and the team will see where an answer is based on facts and where on assumptions.
Start with the purpose of the conference. The wording "hold a forum for partners" is too broad. The venue needs to understand what happens during the day: plenary sessions, parallel breakout sessions, exhibition area, negotiations, recording, broadcasting, translation, catering. The purpose affects the composition of rooms, the proximity of zones, and noise requirements.
Then divide people by roles. The RFP should include registered participants, speakers, the client's team, technical staff, catering, security, interpreters, press, and contractors. For each function, indicate the expected peak. The average number of people per day does not show the load on the entrance, lobby, internet, or dining area.
The minimum project brief includes:
- event name and type;
- purpose and expected outcome for the participant;
- primary city and acceptable alternatives if the city choice is open;
- preferred dates and a backup range;
- setup, technical rehearsal, event, and teardown hours;
- registration forecast and expected in-person attendance;
- number of speakers, employees, and contractors;
- program languages and translation needs;
- in-person, hybrid, or multilingual format;
- requirements for recording, broadcasting, and remote connections;
- draft budget format without disclosing unnecessary internal information;
- deadlines for questions, responses, shortlist selection, site inspection, and decision;
- currency, calculation units, and price validity period.
Separately, prepare the program by time and rooms. The official EIC/APEX Single Facility RFP Template (2026 Edition) includes event history, its goals, audience profile, expected total attendance, and a schedule of functions by hall. The venue receives a space usage scenario and calculates a specific configuration instead of abstract square meter rental.
In the schedule, one row should correspond to one function. Indicate the date, time, number of people, seating, stage, technical tasks, catering, proximity, and changeover time. If the plenary hall becomes a banquet hall an hour later, the venue must confirm in advance who performs the changeover, how long it takes, and which areas are unavailable at that time.
Modular RFP: main section and appendices
Split the RFP into a main section and topic-specific appendices. In the main section, set out a single version of the event, the timeline, the response rules and the price form. In the appendices, describe separately the rooms, audiovisual equipment, internet, catering, accommodation and transport. That way each venue specialist is responsible for their own block, and the result does not fall apart into emails with different assumptions.
We divide the document into modules because different blocks are confirmed by different specialists. A sales manager can confirm the date and the rental. An engineer is responsible for power supply and rigging points. The network team confirms the internet. Catering calculates service points and the menu. When all the questions are mixed into one text, some of the answers inevitably remain generic.
A workable structure might look like this:
- Conference fact sheet and procedure rules.
- City, transport and last mile.
- Room availability calendar.
- Programme by day, time and hall.
- Floor plans, working capacity and flows.
- Setup, unloading, storage and dismantling.
- Audiovisual equipment (AV), internet, power supply and rigging points.
- Accessibility of the space and the programme.
- Catering and dietary requirements.
- Accommodation for delegates and speakers.
- Security, safety and procedures for changes.
- Commercial table, options and exclusions.
- Evidence and open questions form.
- Versions, deadlines and a single clarification log.
For a simple one-day conference, some of the appendices can be shortened. For a multilingual or hybrid programme, several hotels and complex production, it is better not to merge the modules. A separate technical request helps compare the entire production scheme, including the venue's built-in equipment.
We link the RFP to the future conference organisation. The choice of hall affects the scenario, registration, technical solution, catering and the team's work. That is why a request to a venue cannot be written separately from the overall architecture of the event.
If you first need a broad list of options, use the venue catalogue as the starting market, and then filter out properties against the RFP requirements. A listing or presentation helps you find a candidate, but does not replace checking a specific configuration.
How do you calculate working capacity and flows?
Working capacity shows how many people a specific hall configuration can accommodate. Ask for the stage, screens, control desk, cameras, aisles, available seats and service areas to be marked on a scaled floor plan. The same plan must also fit registration, the cloakroom and catering. Only such a layout allows you to check sightlines, routes and the real number of seats for the chosen programme.
We ask the venue to provide an up-to-date scaled floor plan and mark the conference configuration on it. A figure of "up to a thousand people" on its own says nothing about the real number of seats. It may have been calculated without a stage, a technical control desk, wide aisles or service areas.
It is useful to separate three concepts:
The table brings together the key points of this section: Metric, What it means, How it is confirmed. Use it as a quick reference when preparing your event.
| Metric | What it means | How it is confirmed |
|---|---|---|
| Nominal capacity | The maximum from the venue's general specification | Venue data sheet or presentation |
| Design capacity | The number of seats in a given seating layout with stage and equipment | A dated plan of the specific configuration |
| Operational capacity | The number of people the space can serve, taking peaks and routes into account | A plan of flows, queues, service and transitions |
We have put a detailed check of the layout in our material on venue working capacity. In the RFP it is enough to require one basic floor plan and a list of areas that the venue has deducted from the total space. For each alternative, state what changes in the number of seats, sightlines, changeover time and price.
Flows need to be calculated over time. HSE's official guidance on assessing crowd risks suggests taking into account the forecast number of people, their distribution and the audience profile. Entrances and exits, queues, movement inside the venue and bottlenecks are checked separately. That is why the RFP should show several programme peaks: registration, the break, the change of sessions and the final exit.
Ask the venue to work through at least the following points:
- The arrival of the bulk of guests at the opening of registration.
- Simultaneous operation of access control, registration and the cloakroom.
- Entry into the plenary hall before the start.
- The whole hall leaving for the coffee break.
- The change of parallel sessions.
- Queues at toilets, lifts and water points.
- Movement between the exhibition, halls and catering.
- The final exit to the cloakroom, taxis and transfers.
- Guest flows crossing with catering replenishment and waste removal.
- Separation of pedestrians, loading and service vehicles.
In the article on the guest flow management plan we examine the peak map and zone owners in detail. For the RFP, the result matters: the venue must show where a queue forms, whether an additional line can be opened and who makes the decision in the event of overcrowding.
Working capacity becomes a threshold requirement if the programme does not fit without losing essential functions. A beautiful interior or low rent does not compensate for the lack of a second hall, the impossibility of routing the flow to the stage, or a foyer that cannot handle the break peak.
Preparing an RFP is part of overall event management. If you need to bring the venue, programme, production and budget together in one project, send us your brief. We will compile the request and bring the responses into a single frame of reference.
Audiovisual equipment, internet and infrastructure
Start the technical section with the programme scenarios: presentations, questions from the floor, video, remote connections, recording, streaming and interpretation. Then request the equipment diagram, network parameters, backup and the working hours of the specialists. Answers like "there is a screen" or "there is Wi-Fi" do not allow you to verify sightlines, load, compatibility and the cost of the external team's work.
We start the audiovisual equipment block with scenarios. List the talks, panels, questions from the floor, video, remote speakers, recording, streaming, simultaneous interpretation, captions and crew communications. After that, the venue or technical supplier can propose the system composition and state the limitations.
The official EIC/APEX Audio Visual RFP Template (2026 Edition) covers rooms and technical infrastructure, recording, streaming and hybrid connectivity, screens, cameras, lighting, sound, rigging, power distribution, equipment and personnel. Such a list helps verify the entire signal path and the team's work.
In the RFP, specify:
- the number of on-site and remote speakers;
- the formats of presentations and questions;
- the purpose of each screen;
- sightline requirements from the outermost seats;
- the number of cameras and the purpose of the recording;
- the scope of streaming and remote connections;
- separate interpretation, recording or caption tracks;
- the number of wireless and wired microphones by function;
- confidence monitors, timers and crew communications;
- rehearsal and acceptance requirements;
- backup microphones, playback sources and communication channels;
- hours for setup, configuration, standby and dismantling.
For internet, describe the load through the number of simultaneous connections and the network's tasks. Which services are critical? Are wired lines needed for streaming, the press centre, payment or registration? Which functions must keep working if the primary channel fails?
The venue must answer whether guest Wi-Fi is the same product as the production network. Request the dedicated connection parameters the venue is prepared to guarantee, the handover point, port and protocol restrictions, backup and the specialist's response time. If audio and video signals are transmitted over the network, define the owner of the diagram in advance and divide the tasks between the network and technical teams.
A separate question concerns mandatory suppliers. Ask for a list of exclusive services, fees for an external contractor, the procedure for approving rigging, the cost of power, night work and additional access. A condition discovered after shortlisting often changes both the budget and the staging plan.
A complete functional approach to technology is set out in the article on the conference technical rider. In the RFP, take only those requirements from the rider that have already been defined. Mark open decisions as options so that the venue does not include a random set of equipment in the base price.
How do you check the accessibility of the entire route?
Accessibility is checked along the participant's full route: from the drop-off point to registration, the hall, the stage, catering, the restroom and the exit. This module also covers captions, hearing systems, microphones and accessible materials. A ramp at the main entrance confirms only one segment of the route, so ask the venue to show a connected plan for every function of the programme.
We divide this module into route, space, communication and operations. This format helps get a concrete answer instead of the general phrase "the venue is accessible".
The route starts at the stop, car park or drop-off point. From there it goes through the entrance, security, registration, cloakroom, lifts, halls, stage, catering, restrooms and exit. If the conference includes accommodation, add the path from the room to transport and the venue.
The U.S. Access Board's guidance on accessible routes describes a route as a continuous clear connection between accessible elements and spaces. We use this principle as a way to check connectivity, and we confirm the applicable standards for the specific country and venue.
Programme accessibility also needs to be included in the RFP. W3C WAI recommends taking into account in advance acoustics, microphones, hearing systems, live captions, accessible materials and the ability to report individual needs. So ask questions about captions, interpretation, microphones for questions from the floor, seats with the right sightlines and the format of materials.
In the response table, ask the venue to specify:
- the accessible route for each function;
- doors, lifts and alternatives to stairs;
- accessibility of the stage and backstage area for the speaker;
- seats in the hall and seats for those accompanying a participant;
- the height of registration and service desks;
- accessible restrooms and the route to them;
- the responsible member of staff;
- the deadline for ordering additional services;
- the procedure for testing before the doors open;
- the contingency plan if a lift, captions or another critical function fails.
For internal preparation, you can use the route from the article on inclusive corporate events. During a site visit, we walk the route after furniture, desks and cables have been put in place. An empty hall may look accessible, while the finished configuration creates new obstacles.
Catering, accommodation and transport
- For catering, specify the schedule, the number of service points, what the service includes and the terms for adjusting guest numbers.
- For accommodation, provide a room block for each night, by category and rate, plus the terms for reducing the booking.
- For transport, describe the route from the airport or railway station to the entrance, including transfers, the drop-off point, the accessible route and a backup plan in case of failure.
Catering is tied to the floor plan and the programme. If all participants take a short break at the same time, the number of lines, replenishment speed, queue location and staff routes all matter. The menu alone does not answer these questions.
Ask the venue or supplier to specify:
- the format of each service and its operating hours;
- the menu and price for each individual meal;
- the number and location of service points;
- the number of guests the kitchen and lines can serve during a break;
- the infrastructure for preparation and storage;
- staff, equipment, tableware, cleaning and delivery;
- the minimum order, mandatory fees and taxes;
- the terms for external catering and the corkage fee, if applicable;
- special diets and how they are served;
- the deadline for changing the guaranteed number of guests;
- a buffer for late registrations;
- the procedure if the programme runs late.
The official GOV.UK allergen guidance requires providing allergen information, keeping written ingredient records up to date, training staff and preventing cross-contamination. In the RFP, request an allergen matrix, the person responsible for the data, labelling and the procedure for updating information.
It is convenient to cross-check the scope of the service against the material on catering formats at an event. If catering becomes a separate procurement, you can additionally discuss event catering as part of the overall production scheme. When comparing responses, compare the same scope of work; otherwise a lower price may simply exclude staff, equipment or cleaning.
Calculate accommodation for each night. Request room categories, the number of single and double occupancies, team rooms, accessible rooms, rates, taxes, breakfast, internet, block opening and closing dates, and the terms for reduction, cancellation and late check-in. Specify the actual route from the hotel to the venue and a backup plan in case of overbooking.
The transport section should describe the entire travel chain. You need airports and railway stations, travel times in different periods, transfers, the last mile, boarding points, bus parking, the accessible route and a backup plan in case of failure. If organised transfers are planned, logistics and transfers should be linked to arrival schedules, registration, the programme and departure after the finale.
Do not accept the phrase "near the metro" as sufficient proof. Ask for the official route, the number of transfers, operating hours, a step-free route, the drop-off point and the actual approach to the entrance. For an international audience, add clear navigation, support in case of delays and a contact channel on the day of arrival.
How do you set a single response format and full cost?
A single response form makes proposals comparable. It needs a requirement number, priority, closed status, venue solution, exceptions, confirmation and price. A presentation can be attached separately, but all commitments and assumptions must be returned to the table. Otherwise, part of the charges will remain in emails, and the team will take an empty cell as agreement.
Ask the supplier to respond in the order of the requirements and separately note the impossibility of fulfilling an item, the proposed replacement and related costs. The commercial part needs taxes, mandatory fees, price validity period and responsible employees. An empty response remains a gap, and a cost without a calculation is marked as an uncertainty.
We assign a separate number to each requirement. The base table may contain the following columns:
The table collects the key points of the section: Number, Requirement, Priority. Use it as a quick reference when preparing an event.
| Number | Requirement | Priority | Status | Venue solution | Exception or replacement | Evidence | Included in base | Price | Mandatory fees | Responsible | Validity period |
|---|
For status, set a closed set of values: "yes", "no", "partially", "replacement proposed", "requires clarification". An empty cell means that no response has been provided. It must not automatically receive a positive status.
It is convenient to set priorities before receiving prices:
- Threshold - without fulfillment, the option does not make the shortlist;
- Mandatory - the condition must be closed before the contract;
- Desirable - affects the comparative assessment;
- Option - counted separately and included in the scope only after the team's decision.
Next to the requirements, create a separate table of full cost. For each service, specify the unit, quantity, period, rate, mandatory nature, taxes, fees and assumptions. Separately show rent, furniture, security, cloakroom, cleaning, power supply, rigging, internet, technical staff, installation hours, surcharge for work outside the agreed time and services of mandatory suppliers.
We compare three cost levels:
- Comparable base. The same mandatory scope for all venues.
- Probable total. The base plus realistic variable items under the program.
- Risk and uncertainty. Unpriced works, unconfirmed restrictions, possible additional hours, replacements and currency terms.
Such an analysis protects against false savings. If one venue included furniture, network and installation time, and another left them "on request", the second must first be calculated up to the same composition. Only after normalization can the total be compared.
Evidence assessment should be a separate column. A dated plan of a specific seating layout is stronger than an email saying "the hall is suitable". A network diagram, test and service level agreement are stronger than the phrase "the internet is fast". Written confirmation from the technical service is stronger than a verbal comment during a site visit.
Reviewing responses and shortlisting before the site visit
Before the site visit, check the mandatory conditions, completeness of responses, evidence and total cost. This stage is called the desk review of proposals. Include in the shortlist venues that have passed the threshold requirements and require on-site confirmation. It is better to close obvious discrepancies in writing so as not to waste the team's time on an option that is clearly unsuitable.
Reviewing responses before the site visit starts with formal completeness. Are all lines filled in? Is there a separate list of exceptions? Does the version of the programme match? Is the price validity period stated? Are the mandatory contractors named? If data is missing, send a single round of clarifications and give all participants the same deadline.
Then check the threshold requirements. For a conference, these may be the date, working capacity, set-up window, mandatory number of halls, available route, dedicated internet or rigging capability. The set depends on the specific programme. We do not recommend universal weights, because the criticality of criteria differs between an internal conference and an international congress.
Working procedure for shortlisting:
- Exclude options that do not pass the threshold and have no acceptable substitute.
- Close gaps in responses and obtain one up-to-date version.
- Normalise the base scope and total cost.
- Assess the quality of evidence.
- Record technical, commercial and operational risks.
- Select a small group for an on-site inspection.
- Send the same on-site inspection scenario and list of participants.
- Keep the reasons for admission and rejection.
The AC Forum-ICCA RFP Charter published on 18 November 2026 groups the recommendations into five areas: strategic goals, transparency, process and timelines, interaction after submissions and partnership. The process section names structured documents, realistic stages and completeness of information. After submissions, constructive feedback and an explanation of the decision factors are provided for. For selection, this means a clear procedure with identical clarifications for participants.
Do not open visual presentations as the main material before checking the tables. The emotional impression of a hall easily starts to influence the decision before the team sees the constraints on set-up, flows or price. First we check suitability, then we discuss the quality of the environment and the details of the participant experience.
What to check during an on-site inspection
Conduct the on-site inspection according to the conference scenario and the list of open requirements. The team walks the routes for guests, speakers, equipment and service, checks the plans against the actual rooms and records any discrepancies. For each issue, assign an owner and a requirement number in advance. That way, the impression made by the interior will not crowd out checks of installation, flows, accessibility and price.
We conduct the inspection after a desk review of the shortlist. Before the visit, we assign owners for each block: programme and flows, equipment, catering, accessibility, transport, commercial terms. Each has a list of questions and requirement numbers from the RFP.
Using the same route for all venues helps keep the comparison consistent:
- Start at the official arrival point: the stop, car park, taxi rank or bus drop-off point.
- Walk the guest route through security, registration, the cloakroom and the entrance to the main hall.
- Simulate the whole hall leaving for coffee and moving to parallel sessions.
- Check for a continuous step-free route to all essential functions.
- Walk the speaker route from arrival and the speaker room to the backstage area and the stage.
- Stand at the outermost seats and check the view of the stage, screens and captions.
- Locate the position for the control desk, cameras, interpreters and intercom.
- Walk the equipment route from the vehicle entrance through the gates, lifts and turns to the installation point.
- Check the kitchen, service points, replenishment, cleaning and waste removal.
- Ask to be shown the network point, access to technical rooms and the testing procedure.
- Compare the plan, the answer and the actual condition of the rooms.
- Record photos, the question, the owner and the deadline for written confirmation.
The article on technical audit of the venue helps you prepare for such an inspection. The main rule: a verbal promise does not change the assessment until the venue has put it in its official response, disclosed the terms and stated the cost.
During the on-site inspection, do not try to resolve all production details at once. The purpose of the inspection is to confirm suitability and the boundaries of the proposal. If a new solution changes the stage, the number of seats, the internet or the installation time, return it to the matrix and recalculate the affected blocks.
After the visit, issue a short report. It should contain the verified facts, discrepancies, new constraints, open questions, captioned photographs, responsible persons and deadlines. Update scores only on the basis of recorded data. The team's impressions can be kept as a separate comment, but should not be mixed with confirmed criteria.
Versions, questions and changes without confusion
A single active RFP version and a shared Q&A log protect the comparison from confusion. The document header needs a number, date, owner and status. The team sends material clarifications to all participants at the same time, and formalises changes as a numbered addendum. Old files stay in the archive with a note that they have been superseded.
In the header of each document, state the RFP number, version number, issue date, owner and status. A separate change log should briefly explain what changed and which sections need to be recalculated. Old versions are kept in the archive but carry a clear note that the document has been superseded.
Define in advance:
- the question deadline;
- a single address or channel for questions;
- the date answers will be published;
- which answers all participants receive;
- the procedure for issuing addenda;
- the rule for submitting alternatives;
- the date and time proposals close;
- how receipt of the final version is confirmed;
- the period for which the price remains valid;
- the procedure after shortlisting and after the decision.
Do not change requirements in a private chat with a single venue. If a question reveals a material condition of the programme, pricing or evaluation, add the answer to the shared Q&A list without the author's confidential data. That way all participants receive the same information.
After selection, transfer the confirmed terms into the contractual annexes: floor plan, technical specifications, installation schedule, budget, list of inclusions and exclusions, open questions and acceptance criteria. The RFP does not replace the contract, but it helps ensure that agreed terms are not lost in the transition from procurement to production.
A change to the programme should trigger a review of the affected modules. An additional session affects the hall, flows, equipment and staff. A rise in guest numbers changes seating, catering, cloakroom and transport. A new remote speaker affects the network, rehearsal, recording and backup. The version log shows who recalculated the consequences and which scheme is currently in force.
RFP checklist before sending
Go through the checklist with the whole team before sending. The request should describe one version of the conference, set a common response format and separate confirmed terms from assumptions. For critical requirements, state the number, priority, method of confirmation and impact on cost. Separately check the deadlines for questions, site inspection, selection and price validity.
Initial data
- [ ] The purpose and format of the conference are formulated.
- [ ] Dates, backup window and access hours are specified.
- [ ] The number of guests, team, speakers and contractors is separated.
- [ ] The programme is broken down by time, rooms and peak functions.
- [ ] Hybrid, interpretation, recording and streaming are described separately.
- [ ] Deadlines for questions, response, shortlist selection, site inspection and decision are set.
Venue and flows
- [ ] An up-to-date scaled floor plan has been requested.
- [ ] Working capacity is calculated after the stage, equipment and service.
- [ ] Columns, sightlines, doors, lifts and loading are marked on the plan.
- [ ] Entrance, registration, cloakroom, breaks and exit have been checked.
- [ ] Guest and service flows are separated.
- [ ] Set-up, rehearsal and dismantling have confirmed windows.
Audiovisual equipment and network
- [ ] Technical requirements are described through the programme's functions.
- [ ] Guest Wi-Fi is separated from the production network.
- [ ] A dedicated connection, backup and response time have been requested.
- [ ] Recording, streaming, remote connections and interpretation are specified.
- [ ] Mandatory suppliers and restrictions on the external team are listed.
- [ ] Rigging, power, staff and additional hours are included in the price.
Accessibility and service
- [ ] A continuous route through all functions is checked.
- [ ] Accessibility of the stage and backstage area is included.
- [ ] Captions, microphones, hearing systems and materials are described.
- [ ] Catering is linked to the timing and the number of service points.
- [ ] An allergen matrix and the data update process have been requested.
- [ ] The room block is given for each night and category.
- [ ] Transport describes the entire chain, including the last mile.
Response and cost
- [ ] Each requirement has a number and priority.
- [ ] Only the specified statuses are allowed in the response.
- [ ] Exceptions, substitutions and assumptions are disclosed separately.
- [ ] The price is broken down by unit, quantity and period.
- [ ] Taxes, fees, additional hours and mandatory services are shown.
- [ ] The validity period of the proposal is stated.
- [ ] Unknown costs are flagged as a risk; a zero value requires confirmation.
- [ ] Evidence is listed for critical promises.
Procedure
- [ ] The document has a number, version, date and owner.
- [ ] A single question-and-answer log is in place.
- [ ] Addenda are numbered and sent to all participants.
- [ ] Responses are reviewed before the on-site inspection.
- [ ] The on-site inspection follows the same scenario.
- [ ] Verbal promises require written confirmation.
- [ ] Reasons for shortlisting and rejection are recorded.
- [ ] Confirmed terms become appendices after selection.
Frequently asked questions
Before sending it out, put together a single conference brief: the goal, audience composition, expected attendance, dates, working schedule and key programme functions. Add set-up and dismantling hours, and requirements for recording, streaming and interpretation. Then venues will price the same event against the same brief, and the team will see where an answer is based on facts and where on assumptions.
We split the document into modules because different blocks are confirmed by different specialists. A sales manager can confirm the date and the rental. An engineer is responsible for power supply and rigging. The network team confirms the internet. Catering calculates service points and the menu. When all the questions are mixed into one text, some of the answers inevitably stay generic.
Working capacity shows how many people a specific hall configuration will accommodate. Ask for the stage, screens, control desk, cameras, aisles, available seats and service areas to be marked on a scaled plan. Registration, the cloakroom and catering must fit on the same plan. Only such a layout allows you to check sightlines, routes and the real number of seats for the chosen programme.
We start the audiovisual equipment block with scenarios. Specify the talks, panels, questions from the floor, video, remote speakers, recording, streaming, simultaneous interpretation, captions and intercom. After that, the venue or the technical supplier can propose the system composition and state the limitations.
Accessibility is checked along the participant's full route: from the drop-off point to registration, the hall, the stage, catering, the restroom and the exit. The same module covers captions, hearing systems, microphones and accessible materials. A ramp at the main entrance confirms only one section of the route, so ask the venue to show a connected layout for each programme function.
Catering is tied to the floor plan and the programme. If all participants come out for a short break at the same time, the number of lines, the replenishment speed, the queue location and the staff route matter. The menu alone does not answer these questions.
If you need an RFP for a real programme and a subsequent comparison of venues, discuss the task with us. We will put together the requirements, check the responses and link the venue decision to the full organisation of the conference.
Sources
- AC Forum and ICCA: RFP Charter
- EIC/APEX: Single Facility RFP Template (2026 Edition)
- EIC/APEX: Audio Visual RFP Template (2026 Edition)
- HSE: Assess crowd safety risks and identify hazards
- W3C WAI: Making Events Accessible
- U.S. Access Board: Guide to Accessible Routes
- GOV.UK: Allergen guidance for food businesses